Get in Touch

Furfural Extraction Unit Revamp (FEU)

 Home / Projects / FEU Revamp

Project Description

Alex. Petroleum Co. intended to replace the existing Furfural Unit (FEU) using the NMP Solvent.


The American Company Bechtel was Contracted to grant us the use of Bechtel’s Technology and know-how ENPPI is Contracted for Engineering, Construction, Supervision, Commissioning and Start-Up.


PETROJET is the Construction Contractor and the Project is due to Commissioning and Start-Up before the end of 2019

Project Details
Actual Progress   99.5 %



  •   3 Al Max - Alexandria - Egypt
  •   +203 440 2832
         +203 440 2833
         +203 443 0123
  •   +203 443 0124
  •   chairman@alx-pc.com